ID 641586
Archived
Cherokee County
Bid Date: 10/13/2022 at 10:00am
Trades: Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; possible Video Camera Inspections, General Engineering Contractor GEC
The Project generally consists of the following major items: • 1,015 LF of 8” D.I.P. Water Main • 130 LF of 16” Steel Casing Pipe (Open Cut Installation) • 3 EA – Fire Hydrants • 17 Ea. – Relocate/Reconnect Existing Water Services. The time allowed for Substantial Completion is 90 days, and the time allowed for Final Completion and Contract Closeout (readiness for final payment) is 425 days from the Notice to Proceed date, intended to include time after road construction is complete to allow for water main punch list items and contract closeout. Questions via email to Owner by 10/6/2022, 12:00pm. Bonds required.
City of Canton GA
Robert Bartlett
770-933-0280
Login or create an account To view email
Published 09/21/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.