ID 640649

Archived

Barrancas Avenue, "E" Street to "L" Street, Drainage Improvements, Pensacola, FL

Escambia County

Owner Reference: 22-054

Bid Date: 10/17/2022 at 02:30pm

Pre-Bid: 09/20/2022
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OGI3MjhiNmUtMWM2My00MDgwLWFkYWQtNDBmMDA3NmU2YzJm%40thread.v2/0?context=%7b%22Tid%22%3a%222c65e340-c270-42f3-85c0-f94ce72e1e36%22%2c%22Oid%22%3a%229e7aba17-98be-4558-a3c1-a69fcd9155f7%22%7d

Trades: Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

The northernmost right of way and travel lane of Barrancas Avenue experienced issues with standing stormwater issues as well as water overtopping the curb. This is due to the existing stormwater conveyance system being undersized for its contributing basin’s flow. This project will serve to increase the flow capacity of the conveyance system by installing additional inlets and upsizing the existing stormwater piping. As a bid alternate, the right of way will be fitted with bioretention cells to collect water from the travel lane. These bioretention cells no only provide relief for the overtaxed system but also provide stormwater treatment for a currently untreated drainage sub-basin within the Bayou Chico Watershed. As an additional bid alternate, this project is slated to incorporate new ECUA-owned sanitary sewer infrastructure at the Barrancas Ave and Main Street intersection. As a result of these improvements, work site safety, MOT, dewatering, maintenance/bypass of stormwater flow, and erosion control will be paramount issues. General work to be accomplished will include installation of new storm structures, new storm pipe, curb and gutter and sod. The LS Maintenance of Traffic item shall include all signs, devices and other cost associated with maintaining traffic during the project. While not anticipated or required, contractor may elect to perform portions of this project as night work. In the area of intersection with existing asphalt, pavement interface shall be saw cut and the perimeter milled to provide a clean seam between existing and proposed asphalt. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor. All grade work and elevations shall reflect the design information provided in the construction plans. All proposed line and grade work shall be approved by the City Inspector. Contractor’s work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property and business owners at all times during construction. Due to the nature of the project, it is required that bidders visit the site and thoroughly review the plans and specifications. All work shall be in accordance with the standards and specifications of the City of Pensacola. The bidder further proposes and agrees hereby to commence the work with an adequate force and equipment within (10) consecutive calendar days after being notified by the City of Pensacola to do so; and to complete the work and testing within (210) calendar days after the commencement date set by the City of Pensacola. The MBE/WBE Participation goal for this project is 5%. Questions via email to Owner by 9/26/2022, 10:00am. Bonds required.

City of Pensacola FL

George Maiberger
 (850) 435-1603
 Login or create an account To view email

Published 09/14/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.