ID 557532

Archived

Bay Park Sewage Treatment Plant Phase E4 - Electrical Utility Connections, Mineola NY

Nassau County

Owner Reference: S35123-L33E

Bid Date: 10/27/2020 at 10:30am

The principal features of the work to be performed under this contract consist of all labor, equipment, fees, permits, and other related costs necessary for excavations for electrical manholes and underground ductbanks, installation of property line utility manholes, property line utility switches, onsite electrical manholes, underground ductbanks, feeders between property line manholes/switches and the Main Substation, interconnection of utility feeders to existing main service entrance switchgear and transformers, interfacing with revenue metering equipment, installation of load break switches at the Operations Building, 4.2 kV transformers at the Operating Building and Raw Sewage Pump Switchgear Building, elevated platforms for the 4.2kV transformers, removal of interim emergency generator transformers from the roof of the Main Substation, decommissioning and disconnection of Primary Source Power Generators, site restoration, etc. as described in the Contract Documents. Bond required. This project encouraged MBE/WBE participation.

Nassau County

Karen Fay
 (516) 571-7359
 Login or create an account To view email

Published 09/23/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.