ID 533089

Archived

BID DATE CHANGE - WRF Tertiary Treatment Improvements Project, Post Falls ID

Ada County

Bid Date: 05/28/2020 at 02:00pm

Pre-Bid: 03/26/2020
City of Post Falls, 408 N. Spokane St, Post Falls, ID 83854

The project is an upgrade to an existing wastewater reclamation facility (WRF), generally including the following: Conversion of oxidation ditches 1 to 4 from A-0 process to A-2-0 process to recover alkalinity and for total nitrogen reduction. Equipment modifications and additions to oxidation ditches and nutrient reduction equipment in oxidation ditches 5 and 6. New secondary clarifier no. 8 and RAS pumping. New secondary effluent intermediate pump station. New rapid mix, flocculation and plate settler tertiary clarification system. New membrane filtration system and building. New UV system in new building including utility water pumping. New plant drain pump station no. 2. Site, yard piping and electrical system improvements. Other ancillary system improvements. Bids must be accompanied by Bid Security in the form of a bid bond, certified check, cashier’s check or cash in the amount of five percent of the amount of the bid proposal. Said bid security shall be forfeited to the City of Post Falls should the successful bidder fail to enter into contract in accordance with their proposal as specified in the Instructions to Bidders.

City of Post Falls, Idaho

Curtis Butterfield
 (208) 773-3511
 Login or create an account To view email

Published 04/28/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.