ID 539079

Archived

Bonita Waterline Project, Phs IV & V, Safford AZ

Graham County

Owner Reference: 66-683

Bid Date: 06/25/2020 at 02:00pm

The Project includes the following Work: This project is funded by the Water Infrastructure Finance Authority of Arizona; therefore, Davis Bacon Wages do apply as well as the buy American Iron and Steel (AIS) Act. This project is the for the construction of the next two phases of the Bonita Canyon delivery pipeline known as Phase IV and V. The purpose of the proposed Phase IV and V water pipeline improvements is to increase water transmission conveyance capacity to the City of Safford and to improve the reliability of service throughout the City of Safford's water system. Phase IV of the Bonita pipeline replacement project consists of replacement of approximately 6,700 linear feet of 10-inch diameter pipe with a 12-inch diameter pipe. Phase IV begins approximately 350 feet southwest of the intersection of Lone Star Road and US Highway 70, and continues east to the terminus of the Phase III. The proposed alignment of the new 12-inch diameter Phase IV pipeline is indicated on Figure 2, Bonita Phase IV & V Alignment, and follows an alignment that is essentially parallel to the existing 10-inch diameter pipeline. Other than a small portion of the proposed pipeline, the project is located within the Arizona Department of Transportation (ADOT) right-of-way. The proposed Phase IV pipeline project will include one boring beneath the Arizona Eastern Railroad (AZER) adjacent to the west of the intersection of Lone Star Road and US Highway 70. The existing railroad will be bored using a 30-inch diameter schedule 20 steel casing pipe. The carrier pipe within the casing pipe will be a 12-inch diameter class 350 restrained joint ductile iron pipe. Phase V of the 10-inch diameter Bonita pipeline replacement project consists of the replacement of approximately 8,500 linear feet of pipe with a 12-inch diameter pipe. Phase V will keep the same existing pipeline alignment along Lonestar Road. The proposed pipeline will commence east of the intersection of Highway 191 on Lonestar Road, then continue to the west along Lonestar Road and connect to the west end of the Phase IV water pipeline. Two above ground wash crossings are planned for the Phase V portion of the project. The eastern crossing will be across Stockton Wash. The western crossing will be across Graveyard Wash. Both portions of the project shall include all excavation, bedding, backfill, pa 180 days.vement, and patching necessary to complete the work

City of Safford, AZ
 (928) 432-4082

Published 05/13/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.