ID 579682

Archived

Bridge Replacement-Bridge Pkg D-1 Bridge-Immokalee Rd Collier Co, FL

Collier County

Owner Reference: 21-7852-ST

Bid Date: 04/23/2021 at 03:00pm

Pre-Bid: 04/01/2021
Procurement Services Division, Conference Room A, 3295 Tamiami Trail E, Bldg C-2, Naples, FL 34112

Estimate: $2,200,000.00

Collier County is planning the improvement and replacement of 11 bridges generally located on rural collectors in the northern part of Collier County between SR-29 and Hendry County. There are four bridges along CR-858/Oil Well Rd, one bridge on CR-858/County Line Rd and six bridges along CR-846/Immokalee Rd. Oil Well Rd and Immokalee Rd are both east-west corridors within the project limits, while County Line Road is a north-south roadway connecting the two roads along the border with Hendry County. The typical section will be two 12-foot lanes with 8-foot shoulders; with the exception of Bridge No. 030136 that will require two 12-foot travel lanes with a 12-foot center turn lane, 8-foot shoulders and 6-foot sidewalks. The proposed construction of the replacement bridges will require shifting traffic to one lane, removing a portion of the existing superstructure and constructing a portion of the replacement bridge in its place. Then shifting the one lane traffic to the newly constructed portion, removing the remaining portion of the existing superstructure and substructure and constructing the remaining portion of the replacement bridge. Grant Funded

County of Collier FL

Barbara Lance
 (239) 252-8998
 Login or create an account To view email

Published 04/05/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.