This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450

ID: 560986

Bridge Replacement - S-50/Manchester Creek, York Co., SC

York County

Owner Reference: BR46022

11/10/2020
Past bid date

Trades: NAICS 237310 - Highway, Street & Bridge Construction, General Engineering Contractor

Licenses: A

ridge Requirements; 2 Each – 70 Ft. Pre-stressed Exterior Slabs.10 Each –70 Ft. Pre-stressed Interior Slabs. Bridge and components must include all hardware, connection rods, plates, nuts, rubber bearing pads, epoxy filler for dowel holes, and non-shrink grout for shear keys and dowel holes. Bridge and components must be built in accordance with SCDOT Standard Drawings for Bridges. Contractor shall use item(s) from the SCDOT Qualified Products List 11 - Cold Applied Sealants for Bridge Joints to be provided to fill dowel holes on expansion end. Precast Barrier Rail Requirements; Barrier Rails – 140 linear feet total to be provided as follows: Ten (10), ten (10) foot sections of precast concrete barrier rail with drains slots. Four (4), ten (10) foot sections of precast concrete barrier rail without drain slots with guardrail connections to be used at end of bridge. Bond is required please refer to documents for further details about wage rates. This project encouraged M/WBE participation.

Brad Latham
 Upgrade Membership

OwnerLogin or create an account to see more project details. Basic membership is FREE


10NOV4684780OP.pdf
  • Prevail Financial | Jeff Ventress |  (214) 205-8586 |  | Supplier
    ""Here at Prevail Financial we assist small, medium and large size Construction Companies with loans for addition/expansion.""
  • Advertise Your Company Here
Published 10/20/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.