ID 559077

Archived

Bulverde Road Reconstruction Phase IV, Bexar Co., TX

Bexar County

Owner Reference: 2021-002

Bid Date: 11/20/2020 at 10:00AM

Pre-Bid: 10/28/2020
Bexar County Public Works, 1948 Probandt St, San Antonio, TX 78214

Estimate: $8,443,167.00 (not including join-bid utilities)

Bulverde Road Phase IV Reconstruction Project begins at Marshall Road and extends to the north approximately 1.2 miles. Proposed roadway section will consist of a four lane urban roadway with 4 foot outside shoulders and curb. The intersections of Marshall, Valley Creek and Bulverde Oaks Dr. will include dedicated left and right turn lanes. Signal at Bulverde Road'/Bulverde Oaks Dr. intersection will be proposed. Portions of the project will include storm sewer systems consisting of curb inlets, storm sewer pipe, cross drainage improvements, and water quality structures. Bonds required. Prevailing wages apply.

County of Bexar, TX

Reggie Fountain
 (210) 335-6700
 Login or create an account To view email

Published 10/04/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.