ID 632229

Archived

Button Rd, Lower Newtown Rd, and Hayner Rd Water Main Extensions - General Construction Contract, Halfmoon, NY

Saratoga County

Owner Reference: MJ #964.26

Bid Date: 07/14/2022 at 01:00pm

Trades: General Engineering Contractor GEC

The project work site is located along Button Road, Lower Newtown Road, and Hayner Road in the Town of Halfmoon, New York. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including but not necessarily limited to the following: Open-cut installation of approximately 1,200 linear feet and 12,300 linear feet of 12-inch high density polyethylene water main on Button Road and Lower Newtown Road respectively, and 2,500 linear feet of 8-inch high density polyethylene water main on Hayner Road. The work shall include, but not be limited to, the installation of the new water main and associated fittings, hydrant and valve installation, water service installation, connections to the existing water system, and the hydrostatic testing and disinfection of the water main. Furnish and install pre-packaged pressure reducing valve station. Asphalt removal to facilitate installation of the proposed water main and appurtenances. Site restoration including topsoil, seeding, asphalt pavement, and driveway repairs. Work zone traffic control. Bonds required.

Town of Halfmoon NY

Frank Tironi Jr.
 518-371-7410
 Login or create an account To view email

Published 06/19/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.