ID 604877

Archived

Carson Jr High School Roof Replacement on Portable Building, Mesa, AZ

Maricopa County

Owner Reference: 22-33C

Bid Date: 11/17/2021 at 02:00pm

Pre-Bid: 10/27/2021
Carson Jr High, 525 N. Westwood, Mesa, AZ 85201

Remove existing roof shingles and felt paper and haul off, remove all pipe flashing and AC unit flashing and haul off. MPS Construction will inspect plywood, roof trusses and any Fascia that will need to be repaired or replaced. Fascia will be primed and painted. Install new Domestic 30 pound roof paper and new flashing on pipe penetrations and on the AC units per Specifications. Install new metal roof drip edge per Specifications. Install new Tamko brand Asphalt shingles and ridge cap in a light grey color (TBD) installed to Specifications. Caulk and seal around any penetrations as needed. AC condensate lines will be reset back in place. Project roof will always be weather tight. Clean job site thoroughly. This project is to remove and replace the roof on a portable building pat Carson Jr High school per Architect Specifications. Deadline for questions is November 3, 2021 by 10:00am. 

Mesa Public Schools AZ

Karen Fleetwood
 (480) 472-6122
 Login or create an account To view email

Published 10/20/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.