CD 1.04 Chlorine Building Project, Miami FL

Miami-Dade County

Owner Reference: P0240

Bid Date: 06/19/2020 at 10:00am

Pre-Bid: 05/28/2020
3071 SW 38 Ave, Miami FL 33146. Procurement, Room 108

Estimate: $1,795,690

The Work consists of furnishing materials, labor, and equipment necessary for the rehabilitation of the existing Chlorine Building at the South District Wastewater Treatment Plant (SDWWTP) owned and operated by the Miami-Dade Water and Sewer Department. The Main Work under this contract, which is the replacement of the two MCCs and the installation of new VFD Cabinets, will require the construction of a new reinforced concrete slab inside the existing Chlorine Building to comply with the Design Flood Elevation (DFE). This new reinforced concrete slab will have a finished floor elevation of +16.0’ NGVD. This elevation has been selected by the DEPARTMENT as a flood protection elevation for critical equipment to account for the effects of potential climate change, sea level rise and storm surge.

County of Miami-Dade(Water and Sewer)

William Diaz
 (786) 552-8216
 (786) 552-8613
 Login or create an account To view email

Published 05/26/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.