ID 627041

Archived

CEI Services for Palm River Public Utilities Renewal Project, Naples, FL

Collier County

Owner Reference: 22-7998

Bid Date: 06/02/2022 at 03:00PM

Trades: CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for Professional Services (hereinafter, “RPS”) with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and specifications stated or attached. The Consultant, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated. Full time Construction Engineering and Inspection (CEI) services have historically been added to the construction of all Public Utilities Renewal (PUR) projects. PUR projects are projects that replace, simultaneously, the water, wastewater, stormwater, irrigation quality water and sidewalks infrastructures in neighborhoods across the County. CEI work involves providing oversight for the County, ensuring that the Contractor builds the project in reasonable conformity with the plans, specifications, and special provisions for the Construction Contract. The CEI firm is the liaison between the County and the Contractor to observe the Contractor's work to determine the progress and quality of the work. The CEI Consultant identifies discrepancies, reports significant discrepancies to the County, and directs the Contractor to correct such observed discrepancies. Historically, The County, for CEI services, has spent approximately 8% to 10% of the total construction contract for PUR projects; however, this may not be indicative of future buying patterns Bonds required. Prevailing wages.

County of Collier FL

Cynthia McCanna
 (239) 252-8992
 Login or create an account To view email

Published 04/27/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.