Santa Clara County
Owner Reference: SJSU-396
Bid Date: 05/04/2021 at 02:00PM
Pre-Bid: 03/23/2021
past due.
Estimate: $2 Mil
In general, the project consists of the replacement of the existing Central Utility Plant steam absorption Chiller #6 with a new centrifugal electric chiller. The scope includes replacement of Primary Chilled Water (CHW) pumps serving the Chiller, piping, valves, electrical support and controls, adjustment to accommodate the new Chiller replacement of expansion tank and exhaust fans serving the Central Utility Plant. The Project elements include: 1. Replace the 1200 Ton steam absorption Chiller #6 with a 1500 ton electric centrifugal chiller. 2. Install a new electrical service for the new cooling equipment. A new electrical service will be fed from the existing 4160V switchgear with a 480V transformer sized to serve the replacement of Chiller #6 and a future Chiller. 3. Integration into the existing controls system and sequence of operations. Bonds required. Prevailing wages. SBE/DVBE goals
California State University San Jose CSUSJ CA
Sylvia Sosa
(408) 924-1583
Login or create an account To view email
Published 04/10/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.