ID 640144

Archived

*New Bid Date* Chiller Upgrade for the Morris County Courthouse, Morristown, NJ

Morris County

Owner Reference: B22-177

Bid Date: 10/20/2022 at 11:00am

Pre-Bid: 09/15/2022
Beginning at the project location, Morris County Courthouse Building Lobby, Court St., Morristown, New Jersey 07960.

Trades: HVAC Contractor: Heating Ventilating Air Conditioning and Controls, Air Chillers. Includes RTU's

The work is primarily the removal of (4) chillers, (4) associated pumps and variable speed drive, installation of (4) new chillers, (4) new associated pumps and variable speed drives, and the integration of new equipment into existing piping and controls systems. Principal Work: Replace the 440 Ton Chiller Plant: The contractor shall perform all work associated with removing the four (4) existing 110- ton chillers - disconnecting the four existing chillers from existing condenser water and chilled water piping. The contractor shall modify condenser water and chilled water piping in order to connect four (4) new 115 ton chillers to the existing chiller plant. Replace the concrete and steel supports for the new chillers, reconnect to existing water treatment system. Replace the four (4) Chiller Plant pumps: The contractor shall perform all work associated with removing the four (4) existing pumps, two (2) chilled water pumps & two (2) condenser water pumps. The contractor shall modify condenser water and chilled water piping in order to connect four (4) new pumps to the new chilled water plant. Replace the concrete and steel supports for the new pumps. Install New Refrigerant Monitoring System: The contractor shall perform all work associated with installing a new refrigerant monitoring system including all accessories, controls, wiring, etc. Electrical Work: The contractor shall perform all electrical work associated with upgrading the HVAC systems. This shall include all work associated with the new chiller plant controls, replacement chillers, etc. Commissioning: The contractor shall perform all work associated with assisting the owner to commission the entire chiller plant system. Testing, Balancing and Training: The contractor shall perform all work associated with testing and balancing the upgraded chiller plant. the contractor shall train the building maintenance personnel, in coordination with the existing building management system vendor - TPS, on the proper operation of the upgraded chiller plant. The above description of the work is for general information only and in no way limits the responsibility of the Contractor for accomplishing the work in strict accordance with the Construction Drawings and Specifications. Project completion to be within 365 days from notice to proceed. Bonds required. Prevailing wages.

County of Morris NJ

Beti Bauer
 (973) 539-3141
 (973) 829-0304

Published 09/10/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.