ID 604254

Archived

Citywide Accessibility Improvements No 8, Concord, CA

Contra Costa County

Owner Reference: 2519

Bid Date: 11/04/2021 at 02:00pm

Estimate: $300K - $400K

The scope of work is generally for constructing curb ramps at various locations throughout the City of Concord. Work shall include traffic control, pedestrian detours, staging of the work, water pollution control program, clearing and grubbing, curb and gutter, sidewalk, valley gutter, asphalt concrete removal, hot mix asphalt, pavement marking removal and installation; and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer. 

Bonds required. Prevailing wages.

City Of Concord CA

Tianjun Cao
 (925) 671-3243

Published 10/14/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.