Citywide Non-Potable Water Distribution System Project, Brentwood, CA

Contra Costa County

Owner Reference: 592-59202

Bid Date: 04/14/2020 at 02:00pm

Pre-Bid: 03/18/2020
City Hall Terrace View Conference Room 2nd Floor, 150 City Park Way, Brentwood, CA 94513

Estimate: $6,200,000

The Project is located at 230 Fairview Avenue; along Sand Creek Road; along Fairview Ave, and is described as follows: Installation of new 16-inch and 12-inch main non-potable water (“NPW”) pipeline via slip-lining an abandoned 22-inch PG&E gas line; installation of new 18-inch and 16-inch NPW main lines via open trenching; connection to and utilization of existing 16-inch ECCID line; construction of new non-potable water booster pump station and controls building; and connections to existing irrigation system. Project must be completed within 280 working days. Bonds required. Prevailing wages apply. DBE program goals apply.

City Of Brentwood

David Bryan
 925.516.5420
 925.516.5421

Published 02/27/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.