Clara Byrd Baker Elementary School, 3131 Ironbound Rd, Williamsburg, VA, 23185. Vendors must check in at the office and receive a visitor’s pass prior to the meeting and site walk.

Trades: HVA - HVAC Contractor: Heating Ventilating Air Conditioning and Controls, Air Chillers. Includes RTU's, Mechanical Contractor - General Contractor, Electrical Contractor - Lighting, Luminaires, Utility, Transformers, High Voltage (HVE), Roofing Contractor - General Contractor, General Building Contractor GBC/General Contractor GC; Subcontractor Opportunities

The Work under this project consist of replacing the school's HVAC water source heat pumps with hot gas reheat dehumidification type manufactured by Trane of similar type and capacity and upgrading controls as required by Schneider Electric to work with existing equipment. A new stairwell water source heat pump will be added and connected into the existing condenser water system. A new ductless split cassette unit will be added to computer room for supplemental cooling with condenser mounted on roof. Piping and ductwork will be modified and added. HVAC will be testing, adjusted and balanced. HVAC will be commissioned; this commissioning firm will be hired by the Owner. Roofing work includes, but is not limited to, adding condensing unit equipment support and piping curb, where this includes an existing roof warranty that must be maintained. Electrical work includes, but is not limited to, disconnecting the mechanical equipment to be demolished and connecting the new mechanical equipment. Panels and breakers will be added or modified as required to accommodate the revised electrical loads. On site construction for Phase I will begin on June 16, 2023, all work on Phase I shall be Substantial Complete by August 18, 2023. All equipment except rooftop units HP-8 & 9 shall be installed by close of Phase I. On site construction for Phase II will begin on December 29, 2023, and Final Completion is January 26, 2024. Rooftop Units HP-8 & 9 shall be installed in Phase II. Questions due no later than 12:00 P.M., on Wednesday, December 14, 2022. Bonds required.

County of James City VA

Linda Hodges
 (757) 253-6648
 (757) 253-6753
 Login or create an account To view email

Published 11/30/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.