ID 639915

Archived

CM/GC Services for Meyers Pool Replacement, Arvada, CO

Adams County

Owner Reference: 22-FAC-014

Bid Date: 10/03/2022 at 02:00pm

Pre-Bid: 09/15/2022
7900 Carr Dr., Arvada, CO

Trades: CO-01 - General Engineering Contractor GEC, CO-21 - General Contractor GC, Construction Management CM

The Replacement facility will be financed by JCSD and Arvada, the facility will be operated by the Apex. In 2019, the Meyers Pool Steering Committee, working with Ballard and King Associates, an aquatics consulting firm specializing in recreation and sports feasibility studies, completed a feasibility study that examined the projected operational costs, staffing structure, market opportunities, and user preferences including amenities and site for the new pool. Recommendations from Feasibility Study include:  50-meter x 25-yard pool with on-deck seating for 300-400  Separate warmer water and shallower pool for a variety of uses and programming  Spectator seating for 800  Locker rooms for men, women and officials, along with universal changing rooms  Pool mechanical room  Lobby and office space  Support space, including added parking approximately 50% larger than existing. Bonds required.

City Of Arvada CO

Dawn Krank
 (720) 898-7091
 Login or create an account To view email

Published 09/07/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.