CMAR Sawmill Branch Water Supply - Booster Pumping and Storage Improvements, Summerville SC

Dorchester County

Bid Date: 10/06/2022 at 05:00pm

Pre-Bid: 09/21/2022
SCPW Main Office, located at 215 N. Cedar Street, Summerville, SC 29483.

Estimate: $11,887,520

Trades: General Engineering Contractor GEC, At Risk Construction Management CMAR

The Summerville Commissioners of Public Works (SCPW) is seeking properly licensed and qualified contractors to submit proposals for the opportunity to serve as Construction Manager At-Risk (CMAR) for preconstruction services and potential construction services for a project at their potable water supply connection to the Santee Cooper Regional Water System (SCRWS). The “Project” will consist of two (2) 1.0-million-gallon ground storage tanks (GST) and associated yard piping; a booster pump station (BPS) and associated equipment; a 30-inch supply main from the SCRWS meter to the new GST and BPS site; a 30-inch transmission main parallel to an existing 24-inch transmission main into the SCPW water system; demolition of the existing 150,000-gallon Coastal elevated storage tank; and the addition of two (2) check valve vaults and one (1) control valve vault on the distribution lines associated with the North elevated storage tank. The objective of this Request for Proposals (RFP) is to provide additional information to enable Offerors to submit written proposals for the project. Offerors must submit two (2) hard copies of their proposal as well as one (1) USB thumb drive containing a single PDF copy of their proposal. Bonds required. Prevailing wages.

Town of Summerville SC

Walt Fletcher (WK Dickson)
 (843) 416-5560
 Login or create an account To view email

Published 09/15/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.