ID: 640636

Bid Date Change: Collin County Adult Detention Facility, Phase 2 Addition, New Modular Central Plant, McKinney TX

Collin County

Owner Reference: 2022-299

11/17/2022
Past bid date

Pre-Bid:  Login or create an account to see more project details. Basic membership is FREE

Estimate: Group A - $6,660,534, Group B $20,541,881

Trades: General Engineering Contractor GEC; Subcontractor Opportunities, General Contractor GC; Subcontractor Opportunities, Subcontractors

Licenses: A, E100, CO-01, CG, RG, A, A, B, B100, CO-21, CG, RG, B, B

New Construction: Single Prime Contract. The new Modular Central Plant will be located to the north parking lot of the existing Courthouse and will include a new 2,000-ton modular plant that can be expanded up to 5,000 tons. The modular plant shall be provided by a single manufacturer with equipment to be installed and connected as required for operation consistent with the existing central plant. Itis expected that this plant shall provide chilled water for the Courthouse and Administration Building and be decoupled from the existing central plant through motorized valves. The motorized valves, controlled through the County’s BMS system, will allow the modular central plant the ability to provide supplemental cooling to other buildings on the chilled water loop. Bonds required. Prevailing wages.

Hunter Alley
 Upgrade Membership
 Upgrade Membership
 Upgrade Membership


640636_1663168865.pdf
Published 09/14/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.