ID 604663

Archived

Confirmation of Interest to Register for the San Diego Administration Building Project, San Diego, CA

San Diego County

Bid Date: 11/14/2021 at 02:00pm

Design-Build Delivery Method: A component of the ADP implementation is replacement of the Authority’s existing administration building. The location of the existing Airport administration building is in conflict with the proposed Terminal and Roadways and Airside Improvements projects such that these projects cannot be completed until the Authority is moved into the new Building and has completed the demolition of the existing administration building. The Authority intends for the Project to be completed as quickly and cost effectively as possible to minimize potential delays to the other Authority projects. Project includes construction of a new four (4) story Building of approximately 130,000 square-feet and relocation of the following existing major functions (key project features) from the current Authority administration building.  Please note this project will not be out to bid until November 15th, 2021 (when plans will be made available to shortlisted contractors). Sundt is sending out a request for confirmation of interest only to prepare for bidding and to create our bidding contractor’s shortlist. 

Sundt Construction Inc. CA

Airport Projects
 (619) 321-4800

Published 10/18/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.