ID 655710

Archived

Construction Engineering & Inspection Services, Apex, NC

Wake County

Bid Date: 02/10/2023 at 05:00PM

Trades: General Engineering Contractor GEC; Subcontractor Opportunities, Construction Management CM

The project is scheduled for construction in 2023‐2025. The project limits extend from just north of the intersection of Apex Peakway with Chickadee Lane to the intersection with Yateley Lane. The project includes a bridge over South Salem Street and CSX Transportation railroad, widening of South Salem Street, a connector loop from Apex Peakway to South Salem Street, retaining walls, new sections of curb and gutter, sidewalks, storm drainage, and new traffic signals and supporting appurtenances. The tentative construction start date is July 2023, and the tentative construction completion date is June 2025. Bonds required. Prevailing wages.

Town of Apex NC

Adam Stephenson, via email only
 (919) 249-3400
 Login or create an account To view email

Published 01/27/2023 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.