ID 604498

Archived

Construction Management & Inspection Services for West Coast Basin Well 1 Phase 1, Long Beach, CA

Los Angeles County

Owner Reference: O-0745

Bid Date: 11/09/2021 at 03:00pm

Pre-Bid: 10/19/2021
Online MS Teams Meeting - Request meeting information by sending an email to Heather.Rhee@lbwater.org

Estimate: $876,200 (Construction Cost Estimate)

Consulting services shall include reviewing existing plans; evaluating existing facilities and site modifications; providing construction management, resident engineering, and inspection services. LBWD would like to maximize its allocated annual pumping rights in both Central and West Coast Basins by expanding its groundwater production program. Originally constructed in 2017, the West Coast Basin Well 1 (WCB1) is currently in non-operation, but LBWD plans to use this well for water production. LBWD would like to construct a pump-to-waste system for WCB1 for water sampling and to determine types of future water treatment system needed prior to its conveyance into the distribution system.

Bonds required. Prevailing wages.

City of Long Beach Water Commissioners CA
 (562) 570-2327
 (562) 492-9631

Published 10/17/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.