ID 628280

Archived

Country Club & Sunset Lift Stations, El Paso, TX

El Paso County

Owner Reference: 18-22

Bid Date: 06/01/2022 at 01:30pm

Pre-Bid: 05/17/2022
Virtual Teams Meeting. https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_OTc2ZjQ5NDEtZTRlYi00NGJiLTgxZjctZDBhNGM4OWY3NjM5%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25223eebb7d9-9c59-4af3-aca0-00b46518374d%2522%252c%2522Oid%2522%253a%2522b9dc8d19-ebe9-4caa-8219-d738f2977553%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=3c3d33af-2031-47b1-9802-397b45d5b4a7&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Estimate: $2,444,690.59 - $3,585,546.20

Trades: General Engineering Contractor GEC, WWTP Wastewater Treatment Plant Construction & Repair: Tank Power Wash, Pressure Washing - General Engineering Contractor, Building Moving, Wrecking & Demolition Contractor: General Engineering Contractor or General Contractor

The improvements for this project consist of the reconstruction of the Country Club and Sunset Lift Stations. In general, the work encompass: The demolition of existing lift station facilities; removal and replacement of discharge piping, pumps, pump bases, guide bars, wall sleeves, valves chains, access hatch doors, safety grates, and associated electrical instrumentation and mechanical equipment. Complete demolition of existing control rooms and existing manholes. Removal of trees, debris, rockwall, chain link fence and gate(s). Installation and operation of By-Pass System for the duration of the project to maintain uninterrupted (constant) operation of wastewater collection. Groundwater dewatering is anticipated for the reconstruction of the lift stations. Installation of approximately 331 linear feet of force main of various sizes; approximately 354 linear feet of sanitary sewer line of various sizes; approximately 4-48-inch diameter (pre-fab) sanitary sewer manholes; approximately 2-48-inch diameter (cast-in-place) sanitary sewer manholes with fiberglass liner; approximately 2-1-inch diameter water service lines with backflow preventer. Installation of a new wet well, valve vault and prefabricated control room with coating systems, piping, fittings, wall brackets, guide rails, pumps, pump bases, valves, monorail system with electrical hoist, cabinet and other electrical-mechanical components. Grading and drainage, pavement removal and replacement, concrete work including concrete sidewalk, concrete driveways and concrete pads, header curbs; rockwalls, wrought iron fence, rolling gates, rcp pipe; rock excavation and protective shoring system for the new lift station; videotaping of project site before and after construction. Questions are due by 5:00 PM on May 20th. Bonds required. Prevailing wages.

City of El Paso Water Utilities (EPWater) TX

Purchasing
 (915) 594-5628
 Login or create an account To view email

Published 05/11/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.