ID 611623
Archived
Walton County
Owner Reference: ITB 22-012
Bid Date: 02/07/2022 at 03:00PM
Trades: General Engineering Contractor GEC
The CR 280B Multi Use Path project includes the construction of a multi-use path that extends approximately 2 miles from the termination point of the existing sidewalk at the US 331 and CR 280B intersection to CR 280A in Walton County, Florida. Improvements include the construction of a 6 ft wide concrete multi-use path for approximately 250 linear feet that transitions into a 10 ft wide asphalt multi-use path that traverses the remaining 1.9 miles.
Bonds required. Prevailing wages.County of Walton FL
James Walters
(850) 892-8176
Login or create an account To view email
Published 12/17/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.