ID 639987

Archived

CR-90 Stabilization Project Hickory St to CR 75, Bunnell, FL

Flagler County

Owner Reference: 22-037B / 448759-1-54-01

Bid Date: 10/11/2022 at 03:00pm

Pre-Bid: 09/14/2022
Engineering Department conference room, 1769 E. Moody Blvd, Building 2, Bunnell, FL 32110. Although the Pre-Bid Meeting is not mandatory, it will offer potential bidders the only opportunity to ask questions and discuss the project directly with staff.

Trades: Highway, Parking Lot, Road Improvement, Pavement Repair: Resurface Cold Mix Slurry Chip Seal - General Engineering Contractor, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47, Construction Zone Traffic Control: Vehicle Guides, Barricades, Barriers, Guardrail Attenuators, Crash Cushions, Bollard Systems, Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

The scope of work includes but is not limited to the following: the stabilization of the unpaved roadway, County Road 90, in Flagler County. The project limits are along County Road 90 from Hickory Street to County Road 75, for a length of 3 miles. The project scope includes the stabilization of a 22-foot-wide roadway, resulting in two nine-foot paved travel lanes and a two-foot unpaved sodded shoulder in each direction. Additional roadway improvements include driveway tie-ins, and guardrail installation. Drainage improvements include improvements to existing drainage structures, replacement of existing culverts and the regrading of existing ditches and swales, sod stabilization and other related items incidental to the work as the Base Bid. The County is also requesting costs for additive bid alternates that consist of placing 2 inches of Type SP-12.5 (Traffic Level B) asphaltic concrete pavement on top of the stabilized travel lanes and turnouts with associated pavement markings for segments within the project limits. Additive Alternate Bid Options may or may not be accepted and exercised by Flagler County. The Contractor agrees to commence the work to be done under this Contract on the date to be specified in the Notice to Proceed and fully complete all work hereunder within One Hundred Eighty (210) calendar days from the date set forth in the Notice-to-Proceed as completion date. Questions via email or fax to Owner by 9/21/2022, 12:00pm Bonds required. Prevailing wages.

County of Flagler FL

Purchasing
 (386) 313-4010
 (386) 313-4108
 Login or create an account To view email

Published 09/08/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.