ID 630189

Archived

CR97 & CR297A Intersection Improvements, Escambia County, FL

Escambia County

Owner Reference: PD 21-22.078

Bid Date: 06/28/2022 at 03:00pm

Pre-Bid: 06/02/2022
Via Microsoft Teams: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjRlZmQwMmQtY2E0ZS00NDZiLTkzZGUtMWUwM2FjMTE1MmRh%40thread.v2/0?context=%7b%22Tid%22%3a%222c937adb-d946-4b31-90cc-a32f7d460fcd%22%2c%22Oid%22%3a%225d570b26-f7b8-4755-a254-bfa07774eb30%22%7d and in the Office of Purchasing Conference Room, 11.108, at 213 Palafox Pl. Pensacola, FL 32502.

Trades: Highway, Road Improvement or Parking Lot Pavement Repair: May include Resurfacing or Chip Seal - General Engineering Contractor, Highway, Road, Bridge, Dam, Overpass & Runway Construction - General Engineering Contractor - NAICS Code: 237310, Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, Ditches, Traffic Signals, Control & Monitoring - General Engineering Contractor, CU - Underground Utility GPS Location & Construction: Potholing, Cables, Tunnels, Pipes, Power, Communication, Water & Sewer, RU - Underground Utility GPS Location & Construction: Potholing, Cables, Tunnels, Pipes, Power, Communication, Water & Sewer, Erosion Control - General Engineering Contractor, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

This project consists of roadway, signalization, and drainage improvements through the intersection of CR297A & CR97. The roadway improvements generally consist of widening CR97 northerly to create a right turn lane, left turn lane, and through lane on CR97. The drainage improvements include upsizing the culvert under CR97 along with modifications to the concrete ditches on the north, and south of the intersection, and adjustments to the existing ditch and pipe system on CR97. Additionally, two traffic poles will be installed for the proposed configuration. Utility adjustments will be required to facilitate the proposed improvements. Right of way restoration will be accomplished by sodding. Erosion and sediment control will be utilized through construction. The contractor shall commence the Work within ten (10) calendar days from the commencement date established in the Notice to Proceed. The work shall be substantially completed within Two Hundred Seventy (270) calendar days from the Notice to Proceed Date. Questions via email to Owner by 6/9/2022, 5:00pm. Bonds required.

County of Escambia FL

Buzz Roggenbuck
 (850) 595-4878
 Login or create an account To view email

Published 05/27/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.