ID 641607

Archived

new bid date - CT 01-0H0214 Route 169 Construct Soldier Pile Wall, Install Drainage, & Place HMA Type A, Pecwan, CA

Humboldt County

Owner Reference: 01-0H0214 / ACST - ER - 31S6(004)E

Bid Date: 11/08/2022 at 02:00pm

Estimate: $3,220,000

Trades: A - General Engineering Contractor GEC; Subcontractor Opportunities, C8 - Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs, Driveways & Handicap ADA Ramps NIGP 913-47, C12 - Earthwork and Paving Contractor - General Engineering Contractor, C61 - Limited or Specialty Contractor, D9 - Drilling & Blasting, Oil Field Work

All labor, tools, equipment, and expenses to construct soldier pile wall, install drainage, & place HMA (Type A) on Route 169 near Pecwan from 3.4 miles West of Cappell Creek bridge to 0.4 mile East of Weitchpec School Rd. Term is 270 working days. DBE 22% Bonds required. Prevailing wages.

Caltrans Headquarters Sacramento (CADOT) CA

Construction Department
 (916) 227-9179
 Login or create an account To view email

Published 09/21/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.