ID 578292
Archived
Napa County
Owner Reference: 04-4G2104
Bid Date: 04/28/2021 at 02:00pm
Estimate: $9,900,000
All labor, tools, equipment, and expenses to widen Route 121 near Napa from 0.2 mile South to 0.3 mile North of Huichica Creek Bridge, with hot mix asphalt and replace the current culvert with a structural concrete bridge. Bonds required. Prevailing wages apply. DBE requirement is 15 percent. Time to complete is 480 working days.
Caltrans Headquarters, Sacramento, CA
Construction Department
(916) 227-9179
Login or create an account To view email
Published 03/10/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.