ID 603820

Archived

CUCF Culinary Building Steam Condensate Line Replacement, Gunnison UT

Salt Lake County

Owner Reference: 22377110

Bid Date: 11/04/2021 at 03:00PM

Estimate: $350,000

Pre-Qualified - The Department of Corrections has asked for assistance with replacing the Steam Condensate Line for their Culinary Building. The Culinary Building is dependent on steam for cooking and cleaning so shutdowns are limited and MUST be scheduled (See Specifications for details). The Prime General Contract must use a DFCM Pre-Qualified Mechanical Subcontractor for this Project. The DFCM Pre-Qualified Mechanical Contractor list is attached for reference. The Base Bid will consist of all of the work and equipment associated with the replacement of the Steam Condensate Line as outlined in the Plans and Specifications.  **Please Note: The Substantial Completion Date has been set to allow flexibility with the Contractor’s Schedule. However, as noted in the Specifications, the Contractor has sixty (60) days to complete the needed work once mobilized on-site. The Contractor must provide an anticipated Substantial Completion date with they bid. This date must be on or before May 6, 2022. **

Bonds required.

State of Utah Division of Facilities Construction & Management, DFCM UT

Craig Mackay
 (801) 538-3018
 (801) 538-3267
 Login or create an account To view email

Published 10/11/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.