ID 552486

Archived

Dallas Airport Systems Dallas Love Field Entry Road Enhancements, Project Dallas,TX

Dallas County

Owner Reference: CIZ1935

Bid Date: 09/25/2020 at 01:00PM

Estimate: $12 Mil-$13M

The enhancement project will replace and upgrade aesthetics of the streetscape experience for pedestrians and vehicular passengers on Mockingbird Lane between Denton Drive and Lemmon, as well as Herb Kelleher Way from Mockingbird Lane to and around the airport terminal. Scope includes demolition of existing sidewalks, lighting bollards, existing entry sign, existing streetlights; and existing landscaping. Improvements will provide new streetlights; pedestrian crosswalk with signals; sidewalks; installation of electrical transformer and outlets; landscaping and hardscape improvements; entry signage; and coordination with City of Dallas Office of Cultural Affairs’ installation of major public art near the intersection of Mockingbird Lane and Herb Kelleher Way. This project will require continuous coordination with City of Dallas Department of Aviation for safe traffic plans.Q&A due by 08/21/20 at 1Pm.MWBE goals.Bonds required. Prevailing wages.

City of Dallas, TX

Patricia Davis
 (214) 671-2999
 (214) 670-4793
 Login or create an account To view email

Published 08/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.