Dalton Farms Sewer Collection System Replacement Project, Poughkeepsie NY

Dutchess County

Owner Reference: PWC-DFS-2020-05

Bid Date: 06/08/2020 at 01:00pm

Pre-Bid: 06/03/2020
A Mandatory pre-Bid conference and site visit will be held at two different times to accommodate prospective bidders: 11am and 1pm on June 3, 2020. Please e-mail Carol Falcone to schedule an appointment for the time that you would prefer at: cfalcone@dutchessny.gov. The Pre-Bid conference and site visit will be held at the Dalton Farms Wastewater Treatment Plant located at 21 Recreation Rd., Poughquag, NY. Please wear a mask for protection.

Request for Bids for Dalton Farms Sewer Collection System Replacement Clarifier Installation. The project includes the following work: All supervision, labor, transportation and any other item of expense necessary for the installation of a Polychem® clarifier sludge collection system at the Dalton Farms Wastewater Treatment Plant. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent (5%) of Bidder’s maximum Bid price and in the form of a certified check or bank money order or a Bid bond (on the form attached) issued by a surety meeting the requirements of Section 000600 Bonds and Insurance Certificates. This project encouraged MBE/WBE participation.

Dutchess County Water and Wastewater Authority

Carol Falcone
 (845) 486-3627
 Login or create an account To view email

Published 05/26/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.