Estimate: $32,300,000

The San Francisco Public Utilities Commission (“SFPUC”), a department of the City and County of San Francisco (the "City"), seeks to retain the services of a Design-Builder (“DB”) to provide design and construction services for the Moccasin Powerhouse Generator Rehabilitation ("MPGR") located in Moccasin, CA. Design-Build services will include, but are not be limited to: 1. Scope 1: Rehabilitate two vertical shaft synchronous generators at the Moccasin Powerhouse. Each generator is rated 57.5 MVA, 13.8 kV, three-phase, 60 Hz, 0.9 power factor, 300 RPM (24 Poles), 330 field volts. 2. Scope 2: Replace the protective relaying for the two generators to be rehabilitated. 3. Scope 3: Perform an assessment to determine the structural integrity of the existing generator foundations. 4. Scope 4: Perform hazardous materials assessment and abatement for two generators and corresponding power and control circuit raceways. LBE goals. Bonds required. Prevailing wages.

San Francisco Water Power Sewer, CA
 (415) 551-4603
 (415) 554-3225
 Login or create an account To view email

Published 01/14/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.