ID 641098

Archived

Design & Engineering for Centennial Center HVAC Projects, Greeley, CO

Weld County

Owner Reference: B2200140

Bid Date: 10/12/2022 at 10:00am

Pre-Bid: 09/28/2022
915 10th St. Greeley, CO Meet in the Courtyard in front of the main entrance to Plaza South.

Trades: A&E: Professional Architecture, Design, Engineering, Consulting, Consultant Services

Weld County Centennial Center: a. Data Center, Weld County is needing design services to engineer a downflow back up cooling system, into the existing and operating data center in Plaza South. b. Condenser Replacement, Weld County is needing design services to engineer and assist in the replacement of two (2) of the existing Carrier condensing units and all associated connections/controls into the existing Carrier air handlers. These units are on the roof and tie into the third-floor mechanical room at Plaza West. 2. Weld County has a copy of the drawings from the original design in PDF but does not have a Computer-Aided Design (CAD) version of the drawings. 3. Consultant shall provide stamped drawings and engineering documents for each of the scopes described above. These documents and specifications will be used for Weld County to seek bids for the procurement and install of designed equipment and systems. 4. Consultant will provide construction administration including answering questions during the bid process, responding to Request for Information (RFI) during construction and providing punch list inspections. 5. Consultant will be responsible for reviewing existing conditions and systems to best determine what is needed to accomplish the designated task(s). 6. New equipment shall be sized and designed to meet the needs of the spaces in which they serve. 7. All piping and electrical requirements shall be a part of this contract and be all inclusive of a fully operational system and or systems as needed for each space. 8. Consultant shall verify what control systems are being utilized for each piece of equipment and design shall include provisions to maintain current control functions on new equipment. 9. Consultant shall verify existing structure will support weights of new equipment and provide information in the bid documents for getting old equipment out of the building and new equipment in. This may entail structural engineering and will be included in this price. There is no current balance or testing reports for either building. Consultant will be required to gather any and all information and or data needed. 11. Consultant is required to verify that any new design and or equipment meets the needs and functions of the building. Including but not limited to decibel levels of equipment when running as to not interfere with normal day to day operations and or employees that work in each of these buildings. The consultant shall be responsible for researching, collecting, and analyzing relevant information needed to effectively execute this scope of work. The consultant shall be responsible for: 1. Familiarizing themselves with applicable local, state, and federal regulations. 2. Weld County will provide copies existing plans, as needed, on a per project basis. Computer-Aided Design (CAD)/AutoCAD copies of plans are typically NOT available. 3. Working with County personnel and attending a weekly design meeting in person at the Weld County Facilities building at 1105 H Street, Greeley Colorado. At a minimum this will be through the design phase until complete and three meetings throughout the completion of the projects. This does not include and is in addition to the debriefing as mentioned below with the County project team. Bonds required. Prevailing wages.

County of Weld CO

Carolyn Geisert
 (970) 400-4223
 Login or create an account To view email

Published 09/18/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.