ID 553312

Archived

Design Engineering for Newell Creek Pipeline Felton/Graham Hill Replacement Project Santa Cruz,CA

Santa Cruz County

Owner Reference: 1082120-0046

Bid Date: 09/25/2020 at 10:00AM

Pre-Bid: 09/01/2020
Video conferencing only. Email lock.kwan@hdrinc.com for pre-proposal meeting invitation a minimum of 48 hours prior to the meeting.

The Santa Cruz Water Department (City) is soliciting proposals for design engineering services to replace an existing 25,083 feet of the Newell Creek Pipeline from Felton Booster Pump Station to Graham Hill Road (Felton/Graham Hill) with a new 23,745 feet pipeline in a new alignment. Engineering and design services include field investigation (topographic survey and geotechnical investigation), preliminary and final designs, and bidding documents, and project management services during design.

City of Santa Cruz, Water, CA

Lock Kwan
 (925) 974-2569
 (831) 420-5201
 Login or create an account To view email

Published 09/14/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.