ID 641270

Archived

Design of Golden Hill Improvements I, San Diego, CA

San Diego County

Owner Reference: H2326125

Bid Date: 10/20/2022 at 04:00pm

Estimate: Between $650,000 & $750,000

Trades: A&E: Professional Architecture, Design, Engineering, Consulting, Consultant Services

The Scope of Services defines the extent of the Design Professional services necessary to complete the required work and documents specified herein for: Design (Plans, Specifications, and Estimates), assistance during the bidding and award stage, Construction Support, and As-Built generation of Golden Hill Improv 1, herein referred to as Project. The Design Professional will be required to perform all research studies, reviews, and coordination necessary to finalize the design and prepare the plans and specifications using the latest applicable City of San Diego design and construction standards. The Design Professional will be required to submit a Basis of Design Report and design packages for review at 30%, 60%, 100% and Final Design. The Design Professional will be required to go through the City’s latest plan check process at 30%, 60%,100%, and Final Design stages (as applicable) to meet all City of San Diego requirements. Each design stage will have minimum requirements that will be coordinated, reviewed, and accepted by different controlling entities within the City in order to be considered for the next stage. Each review cycle will require the Design Professional to attend comment review meetings with the reviewing parties to address comments. Several as-needed intermediate meetings may also be required in order to fully resolve questions and conflicts. The Design Professional will be responsible for: designing water and sewer mains, designing ADA compliant curb ramps, coordinating the resolution of all potential utility conflicts, assisting in securing all environmental permits and any other permits, permanent and temporary easement access rights required to complete the design and construction of the Project. In addition to those tasks, the Design Professional will provide design services, bid and award support, construction support, and as-built services for the Project. The Scope of Services document (Attachment B - Exhibit A) is to be reviewed along with the attached location map and preliminary exhibits. The map and exhibits shall be considered an extension of this Scope of Services document. The City shall apply a maximum of an additional 12 points for Small Local Business Enterprise (SLBE) or Emerging Local Business Enterprise (ELBE) participation, to the proposer’s subtotal maximum evaluation points.

City of San Diego CA

John Mendivil
 (619) 985-8295
 Login or create an account To view email

Published 09/19/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.