ID 580567
Archived
Pierce County
Owner Reference: 18626.01
Bid Date: 04/27/2021 at 02:00PM
Estimate: $490,000
This project is broken into two schedules of work: Schedule A includes pavement preservation improvement at the Edgewood Drive East and Sumner Heights Drive East intersection. Work includes excavation, subgrade repair, crushed surfacing, paving, cement concrete panel removal and replacement, concrete barrier, beam guardrail improvements, channelization, signing and traffic control. Schedule A is a TIB eligible schedule of work. Schedule B includes stormwater improvements within the intersection improvement limits. This schedule of work includes approximately 650 LF of 12-inch to 18-inch diameter storm pipe, catch basins, trench excavation, backfill and repair, stormwater bypass, removal of storm pipe and structures, and traffic control.
City of Edgewood, WA
Tani Stafford, P.E.
(206) 284-0860
Login or create an account To view email
Published 03/30/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.