ID 627721

Archived

Eurasian Watermilfoil Treatment on the Utah Portion of Bear Lake,

Rich County

Owner Reference: KL22-138

Bid Date: 05/24/2022 at 02:00pm

Trades: Environmental, E100 - General Engineering Contractor GEC

The overall purpose of this project is to implement chemical treatment of Eurasian watermilfoil at targeted areas of Bear Lake in accordance with EPA NPDES and Utah DEQ Pesticide General Permit Requirements. These treatments are intended to reduce the spread of Eurasian watermilfoil throughout the lake and the larger Bear River system and assist FFSL in the protection of our Public Trust values on sovereign land. It is the intention to establish a 3 year contract that will allow for 3 rounds of treatment, one during summer/fall of 2022, a second during summer/fall of 2023, and the third during the summer/fall of 2024.

State of Utah Division of Forestry, Fire, & State Lands

Kevin Lucus
 (801) 957-7281
 Login or create an account To view email

Published 05/04/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.