ID 628202
Archived
Alameda County
Owner Reference: 15TK-170 - SFV
Bid Date: 05/31/2022 at 02:00pm
Pre-Bid: 04/28/2022
contact Amanda Palmquist to RSVP and receive instructions.
Estimate: $330,000 - $370,000
Trades: A - General Engineering Contractor GEC
The demolition, disposal and replacement of approximately 100 feet of fire line and supports located underneath the SF Ferry Building wharf. Install bollards, relocate and install a new fire hydrant, per the request of the SFFD. Repair any holes or damage from the demolition or construction process. The work will require special equipment, barge, and floating docks to access the area underneath the wharf. DBE/MBE/WBE participation requirements. Bonds required. Prevailing wages.
San Francisco Bay Area Rapid Transit District CA
Amanda Palmquist
(510) 464-6000
Login or create an account To view email
Published 05/10/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.