Estimate: $2,500,000

The scope of work includes, but is not limited to: install pad-mounted 12KV to 480V and 208/120V transformers with all the infrastructure including all 12KV Switchgear, 12KV cable, 480V and 208Y/120V Switchboards, underground conduits, wire & cable, concrete pads, grounding equipment and connections, patching and restoring roadway, sidewalk, curb surfaces upon installation of underground and above work. Install charging infrastructure for buses, relief vehicles, including pads, charging pedestals, dispensers, underground & overhead conduits and pullboxes for future including power monitoring equipment. Project duration is 180 calendar days from NTP. Questions are due by Apr 20th @ 5:00 PM. Bonds required. Prevailing wages apply. DBE participation goal is 12% for the city. This project requires GFE only as it has no goal established.

City of Fresno CA

Sandra Gamez
 (559) 621-1169
 Login or create an account To view email

Published 04/05/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.