ID 540761

Archived

Fruitvale Avenue and Allendale Avenue Traffic Signal Improvements Project, Saratoga CA

Santa Clara County

Bid Date: 06/04/2020 at 11:00am

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Fruitvale Ave and Allendale Ave Traffic Signals Improvements. Existing base and bituminous surfacing shown on the plans to be removed shall be removed to a depth as shown on plans below the grade of the existing surfacing. Resulting holes and depressions shall be backfilled with earthy material selected from excavation to the lines and grade established by the Engineer. Removal of existing asphalt concrete and base work shall consist of excavation and removal of asphalt concrete, base and subsoil to design subgrade as shown on the plans. This work shall include saw-cutting as needed and disposal of asphalt concrete and aggregate base.

City of Saratoga

John Cherbone
 (408) 868-1241
 Login or create an account To view email

Published 05/26/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.