ID 632131

Archived

Full Depth Reclamation & Paving, Haywood County, TN

Haywood County

Owner Reference: CNW266

Bid Date: 07/01/2022 at 10:00am

Trades: Highway, Road Improvement, Parking Lot Pavement Construction/Repair: Resurfacing or Chip Seal - General Engineering Contractor, General Engineering Contractor GEC

Project description: The full depth reclamation and paving on S.R. 179 from the Tipton County line (L.M. 0.00) to U.S. 79 (S.R. 1) (L.M. 4.27). Project Length - 4.270 miles. The full depth reclamation and paving on S.R. 222 from near Stanton-Sommerville Road (L.M. 3.00) to U.S. 79 (S.R. 1) (L.M. 4.52). Project Length - 1.520 miles. Total Contract Length - 5.790 miles. Completion Time - On or before 11/15/2022. Each prospective bidder and subcontractor will be required to file the “Prequalification Questionnaire” form provided on the Construction Division’s website at least 14 days prior to the date of bid opening. Bonds required. Prevailing wages.

State of Tennessee Department of Transportation (TNDOT) TN

Headquarters Construction Office
 (615) 741-2414

Published 06/17/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.