ID 661234

Archived

Fuller Lane / Tye Valley & Preswick Channel Drainage Improvements, Harker Heights, TX

Bell County

Owner Reference: 23-560-116-01

Bid Date: 03/30/2023 at 02:00pm

Pre-Bid: 03/14/2023
Meeting Room C, at the Harker Heights City Activity Center, 400 Indian Trail, Harker Heights, Texas

Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, General Engineering Contractor GEC; Subcontractor Opportunities

General Conditions Mobilization & Bonds Storm Water Pollution Prevention Plan and Implementation Traffic Safety Plan and Implementation Right-of-Way Preparation and Grading Revegetation of Disturbed Areas Drainage Improvements Culvert Replacement (3-30” RCP with Headwalls) Mortared Rock Riprap Roadway Reconstruction (Excavation, Installation of New Base Material) Asphalt Overlay Concrete Channel Removal and Replacement (6-inch Reinforced Concrete). The Contractor shall have 150 consecutive calendar days to complete the proposed work. Bonds required. Prevailing wages.

City of Harker Heights TX

KPA Engineers
 (254) 773-3731
 Login or create an account To view email

Published 03/07/2023 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.