ID 626261
Archived
Orange County
Owner Reference: FUL-2022-1
Bid Date: 06/02/2022 at 02:00pm
Pre-Bid: 04/28/2022
Good Faith Effort Pre-bid meeting: via Zoom. https://ocwd.zoom.us/j/89204655770?pwd=SHNwWFZRM3dMdGxkcGRpOW5pcGRNQT09 Meeting ID: 89204655770 Passcode: 122083.
Onsite Pre-bid Meeting is scheduled to be held on May 5, 2022 at 10:00am at 627 La Palma Avenue, Anaheim, CA 92801.
Estimate: $6,500,000
Trades: A - General Engineering Contractor GEC
The work includes but is not limited to the following: The Fullerton Main Plant PFAS Water Treatment Plant project generally consists of the following major components: Take delivery and install District furnished Dual Media Pressure Vessel systems at the Water Treatment Plant including pressure testing, disinfection, and bacteria testing. Take delivery and install District furnished Granular Activated Carbon (GAC) system media into dual media pressure vessels. Furnish and install a backwash system for the Granular Activated Carbon (GAC) system. Coordinate and assist with installation of District purchased media. Rehabilitation (redevelopment) of City water supply well number 3A. Furnish and install a new well pump and motor. Water Treatment Plant Structural Concrete: Construct structural concrete at the Fullerton Main Plant site for the PFAS Water Treatment Plant. Connect to the Water Treatment Plant and to the distribution system: Furnish and install epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipelines to the Granular Activated Carbon (GAC) system. Construct epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipeline from the GAC system to the connection to the distribution system. Paving and Site Improvements: Grading, Asphalt Paving, and drainage at the new water treatment plant. Exterior Wall, gate, landscaping, and irrigation. Electrical and Instrumentation: Electrical equipment and facilities, and instrumentation equipment and facilities at the new water treatment plant. Instrumentation and control systems shall be coordinated with the City’s Controls Integrator. Provide all commissioning and start-up-services. Bonds required. Prevailing wages.
Orange County Water District CA
Ryan Bouley
(714) 378-8207
Login or create an account To view email
Published 04/20/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.