ID 554483

Archived

Fullerton Road Grade Separation Project, Los Angeles Co., CA

Los Angeles County

Owner Reference: 20-11

Bid Date: 10/26/2020 at 02:00pm

Pre-Bid: 09/15/2020
Three meetings. Bidders Must attend one of them. 9/16 @ 09:00 AM. 9/17 @ 09:00 AM. All are at: 1210 Fullerton Road, City of Industry, CA 91748.

Estimate: $50,000,000 - $60,000,000

This Project is to complete a partially completed project located in the City of Industry crossing the Union Pacific Railroad (UPRR) Los Angeles Subdivision and Metrolink (Riverside Line) at UPRR milepost 21.43. The project eliminates the existing at-grade crossing at this location through construction of a combination of railroad flyover & roadway underpass. A Railroad Street over-crossing and pedestrian bridge south of the railroad bridge will be constructed. This project also includes roadway improvements (reconstruction, widening and realignment) for: Fullerton Road: from Rowland/San Jose Street to Pomona Freeway (Route 60) eastbound off-ramp; Pomona Freeway (Route 60) westbound on and off-ramps at Fullerton Road. Project duration is 1,188 days. Questions due by Sept 23rd @ 5:00 PM. Bonds required. Prevailing wages apply.

San Gabriel Valley Council of Governments, ACE Project, CA

Memo Ponce
 (626) 962-9292
 (626) 962-9393
 Login or create an account To view email

Published 09/01/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.