ID 540641

Archived

FY2019-20 Corrugated Metal Pipe Annual Repair/Replace Project, Poway, CA

San Diego County

Owner Reference: 20-012

Bid Date: 06/23/2020 at 04:00pm

Estimate: $430,000

This project includes the rehabilitation and replacement of existing corrugated metal drainage pipes (CMPs) with the cured-in-place (CIPP) trenchless lining process and reinforced concrete pipe (RCP). Lining will include approximately 362 total linear feet of existing pipe. The work will include, but is not limited to, the following: cleaning storm drain pipes and structures, CCTV pipe inspection and video work, CIPP trenchless lining, replacement of CMP storm drain, storm drain structure repair and installation, traffic control and all related and necessary work as defined in the contract documents. Project duration is 60 work days. Bonds required. Prevailing wages apply.

City of Poway

Brian Banzuelo
 (858) 668-4623
 (858) 668-1212
 Login or create an account To view email

Published 05/26/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.