ID 603187
Archived
Pima County
Owner Reference: IFB-PO-2200022
Bid Date: 10/26/2021 at 02:00pm
Pre-Bid: 10/12/2021
https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_M2Q1ZGJhZGEtN2Q3ZC00YmYyLWI2ODUtNmI5ZWU1N2U5N2Y3%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252233b6e2c3-0b1a-4879-b741-47461a6c1a89%2522%252c%2522Oid%2522%253a%2522bf4da6c4-e9b4-4614-938c-7f4fc5d16918%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=ba1d3a8b-af1c-4c2f-8b34-c74773e170f6&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true
Estimate: $7,000,000 - $8,000,000
Pima County is seeking sealed bids for construction of FY22 Pavement Repair and Preservation Program, High Volume & Low Volume Roadways District 1 Area A – Mill and Pave. The Project consists of milling of existing asphalt, and 2” overlay in Board of Supervisor District 1 Area A within Pima County, also includes traffic striping, traffic control, and miscellaneous work as needed. The general project area is northeast of the intersection of N. Oracle Road and E. River Road. The project shall be complete and in place within 120 working days from Notice to Proceed and/or no later than May 31, 2022, whichever comes first.
Bonds required.County of Pima AZ
Dawn Dargan
(520) 724-9999
(520) 740-8161
Login or create an account To view email
Published 10/05/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.