ID 641674

Archived

Gainer Road, Houston Road East, Foxworth Road, Farrell Nelson Road, Old Mill Road, Bush Road & Johns Way, Chipley, FL

Alachua County

Owner Reference: 2022-19

Bid Date: 10/18/2022 at 03:00pm

Trades: Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal, CU - Excavation & Grading Contractor, Trenching, Backfill, Digging, Ditching, Rock Stabilization - General Engineering Contractor, RU - Excavation & Grading Contractor, Trenching, Backfill, Digging, Ditching, Rock Stabilization - General Engineering Contractor, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47, Electrical Signs & Signage Contractor: Exterior Advertising or Wayfinding, Pavement Marking & Striping, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

These project(s) consist of stabilizing existing roadways; construction of geotextile, base, and asphalt; reworking existing grassed shoulders; regrading ditches as necessary; driveway turnout construction; signing and pavement markings; and providing other rehabilitation and restoration activities as necessary. Bidders shall be licensed contractor (if applicable) and shall be pre-qualified with the Florida Department of Transportation in accordance with FDOT Standard Specifications for Road and Bridge Construction, Section 2- Proposal Requirements and Conditions. The Prime contractor at a minimum shall be FDOT qualified in Flexible Paving and Hot Plant-Mixed Bituminous courses. Additionally, the Prime Contractor or Subcontractor shall be qualified in Grading; Grassing, Seeding and Sodding; Pavement Marking; and Roadway Signing. Contract time: 435 days. Questions via email to Owner by 10, 3:00pm. Bonds required.

County of Washington FL

Kimberly Birge-Gorman
 850) 638-6200
 Login or create an account To view email

Published 09/22/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.