ID 539981

Archived

Garden Corner Curves Construction Project, Tualatin OR

Washington County

Bid Date: 06/23/2020 at 02:00pm

Major items of work consist of the installation of 15,100 square feet of new pervious shared-use path (asphalt or concrete), 3300 square feet of concrete sidewalks and ramps, 1010 tons of asphalt-paved roadway, MSE, block and cantilever retaining walls, a 15-foot wide pre-cast concrete stream culvert, stream channelization and restoration improvements, stormwater and sewer conveyance improvements, sewer pipe replacement and/or rehabilitation, potable water hydrant relocation, landscaping and water quality facility landscaping, electronic signs, striping, signage, and related work.

City of Tualatin
 (503) 691-3065

Published 05/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.