ID 576997

Archived

Golden Valley Road Rehabilitation, Washoe Co., NV

Washoe County

Owner Reference: PWP-WA-2021-012

Bid Date: 03/25/2021 at 10:00AM

Pre-Bid: 03/11/2021
Via tele-conference. Call In Number: (888) 808-6929 Access Code: 2309684

Estimate: $800,000 - $1,000,000

The major work items include: Reconstruction of existing pavement structure, removal and replacement of manholes, catch basins, storm drain pipe, sidewalks, curb & gutter, pedestrian ramps, commercial and private driveways, and installation of bus stops. The work, including any and all alternates and options, shall be completed within forty (40) working days. Bonds required. Prevailing wages apply.

Regional Transportation Commission

Sara Going, P.E.
 (775) 335-1897
 Login or create an account To view email

Published 02/27/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.